na ja
Followers: 0 Following: 0
Statistics
RANK
16.415
of 295.467
REPUTATION
2
CONTRIBUTIONS
7 Questions
1 Answer
ANSWER ACCEPTANCE
85.71%
VOTES RECEIVED
2
RANK
of 20.234
REPUTATION
N/A
AVERAGE RATING
0.00
CONTRIBUTIONS
0 Files
DOWNLOADS
0
ALL TIME DOWNLOADS
0
RANK
of 153.912
CONTRIBUTIONS
0 Problems
0 Solutions
SCORE
0
NUMBER OF BADGES
0
CONTRIBUTIONS
0 Posts
CONTRIBUTIONS
0 Public Channels
AVERAGE RATING
CONTRIBUTIONS
0 Highlights
AVERAGE NO. OF LIKES
Feeds
Question
How to detect whether 72 hours have passed after the occurrence of a certain event? - datenum gives error for longer time series.
I am working on a time series which consists of sensor outputs at various date and time. I need to find out whether the sensor o...
ongeveer 8 jaar ago | 2 answers | 0
2
answersQuestion
Why I am getting error for performing AIC test for model orders varying in 0:3 range?
For ARIMA(p,d,q) if AIC test is applied for p,q = 0:3 keeping d = 0 and 1, it shows error. I want to confirm for possibilities w...
ongeveer 8 jaar ago | 1 answer | 0
1
answerdynamic structure reference gives error
OK, solved it. I put it in this way: grade_n = 'NL330260'; d.((char(grade_n) ))
ongeveer 8 jaar ago | 0
Question
dynamic structure reference gives error
I have s structure field named d.NL330260 and a temporary variable grade_n which is a 1x1 cell array containing 'NL330260'. I tr...
ongeveer 8 jaar ago | 2 answers | 0
2
answersQuestion
How to automate ARIMA model 'order' selection based on ACF and PACF plots?
While modeling in MATLAB, we have to provide values of p, d and q in arima(p,d,q) implementation, by observing ACF - PACF plots ...
ongeveer 8 jaar ago | 1 answer | 2
1
answerQuestion
how to access an array using a string?
I have 5 arrays which store the past 100 values related with 5 entities of a time series. time series contains of data values an...
ongeveer 8 jaar ago | 3 answers | 0
3
answersQuestion
One step ahead forecast from an estimated model - error term
I have estimated the model for my series and it is arima(1,1,1). Instead of available k-step ahead option, I need to do one-step...
ongeveer 8 jaar ago | 1 answer | 0
1
answerQuestion
How should I fit best ARMA/ARIMA model for an excel sheet data?
Hi, I have basic knowledge of statistics. I have an excel sheet which consists of sensor output at unequal time intervals. When...
meer dan 8 jaar ago | 0 answers | 0