Simulating ESS with real world data
8 views (last 30 days)
Show older comments
Hello I am a electrical engineering student doing a project with a local power company using the data from their stations with the goal to research how a ESS might be able to peak shave and increase the utilization rate of the local grid. I have run into several problems while doing this however, initially I tried to solve this with a battery and doing a 3 phase inverter to charge/discharge the battery but the battery would draw hundreds or thousands of ampere while trying to charge it and I was not able to implement any current limiters. Furthermore I tried to simplify the design even further just using a normal load as discharge and a synchronous machine as a generator for the peak shaving aspect aswell as a programable 3 phase voltage supply.
In the image of the simulink project i have used relays for switching the "discharging" of the power supply, acting as a battery and a generator as the "grid".
Maybe I am missing something crucial needed to make this work but I simply cannot understand what this might be?
Thanks for all and any help I might get, thanks.
0 Comments
Answers (1)
Sabin
on 7 Jul 2025
Edited: Sabin
on 7 Jul 2025
Simscape Battery provides an example that shows how to model a battery energy storage system (BESS) controller and a battery management system (BMS) with all the necessary functions for the peak shaving. The peak shaving and BESS operation follow the IEEE Std 1547-2018 and IEEE 2030.2.1-2019 standards. This example can be a good starting point.
0 Comments
See Also
Categories
Find more on Simscape Electrical in Help Center and File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!