I am running on our cluster an .m file which contains parfor loops.
Using a cluster config file (below), I request 5 nodes, each nodes has 48 procs, which I open with parpool(5*48) workers.
I am able to logon to each node individually and monitor its use with htop.
I see that on each node indeed matlab is running. But it seems that only 1 node is being used by looking at ram usage. If I increase the parfor loop, the process crashes.
I was looking at other posts, that mention setting a parameter LASTN = maxNumCompThreads('automatic'). This is equal to 30 before setting anything. I have tried setting this equal to the total number of workers, eg numProcs*numNodes=48*5.
  1. Here is the node that's being used: 111-150GB being used. When the parfor loop is too big, that node's ram maxes out at 187 and matlab crashes. Also, perhaps noteworthy this is not the head node.
2. Here is an example of an unused node: Note that 34 G is the total ram usage when matlab is idle
This is the config file I run, before I run my job. To confirm stuff before the run I can do eg c.AdditionalProperties.NumNodes and ... .numWorkers and get the expected amount (numnodes=numworkers=5*48)
clear;clc
allNames = parallel.clusterProfiles()
rehash toolbox
configCluster
%/usr/local/MATLAB/R2019
c=parcluster;
c.AdditionalProperties.WallTime = '24:20:0';
c.AdditionalProperties.QueueName = 'CAC48M192_L';
c.AdditionalProperties.AccountName = 'redacted';
nn = 5;
pp = 48;
c.AdditionalProperties.NumNodes = nn;
c.AdditionalProperties.ProcsPerNode = pp;
c.AdditionalProperties.NumWorkers = pp*nn;
c.saveProfile
%end
  1 Comment
Science Machine
Science Machine on 4 Oct 2022
I'm starting to think this has to do with what parfor does, which is calling simply calling omp. Isn't something more needed than omp for multiple nodes, like actual mpi calls? In that case, it seems matlab is incapable of running on more than 1 node, even with parallel server, or does PS somehow extend parfor (and thus omp)?

Sign in to comment.

Accepted Answer

Science Machine
Science Machine on 17 Oct 2022
I realized, I needed to explicitly pass the number of procs, such as
totalProcCount=2*48 % 2 nodes, each node has 48 processors
parfor (i=1:100, totalProcCount) % explicitly pass the total proc count
% do something
end
This is the only way I'm able to get it to act on more than 1 node. I monitored that with
bb = get(getCurrentTask(),'ID');
display(bb)
  2 Comments
Raymond Norris
Raymond Norris on 17 Oct 2022
In this case, totalProcCount tells parfor the number of workers to allocate to the loop. You might do this in the case where 100 workers are running, but you only want 50 to be used. If you don't specify this, all 100 workers maybe used.
Take the following example of running a local pool, which clearly can't run across >1 node.
local = parcluster("local");
pool = local.parpool(4);
tic
parfor (idx = 1:16,2)
pause(2)
end
toc
Run this and you'll see it takes ~16.5s (instead of the 8+s). You can verify that all the workers are on the same node (which of course they have to be)
spmd, [~,hn] = system('hostname'), end
This is just to explain that totalProcs doesn't control this.
Science Machine
Science Machine on 17 Oct 2022
Edited: Science Machine on 17 Oct 2022
I see, 100 workers is less efficient because in general we want the number of workers, to be the number of procs right? But, if I am using lets way 96 processors (allocated on two nodes, each node having 48 procs), then I want 96 workers, right? Without specifying the totalProcs parameter in the parfor, I was able to see that 96 matlab processes were spawned, howeber, only 48 processors were used -- based on htop's CPU and ram output. With using the totProcs parameter in parfor, I was able to see that indeed not only eg 98 processes were spawned, but also that ram and cpu on each node were being used by matlab
I am using:
rehash toolbox
configCluster
%/usr/local/MATLAB/R2019
c=parcluster;
nn = 6;
pp = 48;
c.AdditionalProperties.NumNodes = nn;
c.AdditionalProperties.ProcsPerNode = pp;
c.AdditionalProperties.NumWorkers = pp*nn;
c.AdditionalProperties.MemUsage= '2Gb';

Sign in to comment.

More Answers (1)

Raymond Norris
Raymond Norris on 6 Oct 2022
Starting a parpool will create very little activity for the workers. It's only once you run a parallel construct (e.g., parfor) will any work be given to the workers.
Increasing the parfor loop shouldn't crash the workers. What are working are you doing? Did you request enough memory (c.AdditionalProperties.MemUsage)? Or do you mean increasing the parallel pool?
I can't tell where you're running MATLAB (your machine, head node, compute node?), but I suspect if the maxNumCompThreads is 30, and there are 48 cores per node, you're not running MATLAB on the compute node. You don't want thread count to be greater than the number of cores on a node (since they won't spawn across nodes). To set the thread count, call
c.NumThreads = 48;
This will then force each worker to run on its own node.
Workers are capable of running more than one node. Post a bit more context and we can figure out what's going on.
  • Are you running MATLAB on your machine, head node, or compute node?
  • Are you sbumitting jobs with parpool or batch?
  • What size pool are you starting (i.e., parpool(X) or batch(.., 'Pool', X);
  • Can you provide the code you're trying to run?
  5 Comments
Science Machine
Science Machine on 16 Oct 2022
If I submit a job with pool=c.parpool(N), where N is anything but 1, I get the error,
Error using parallel.Cluster/parpool (line 86)
Parallel pool failed to start with the following error. For more detailed information, validate the profile
'RedactedClusterProfileName' in the Cluster Profile Manager.
Caused by:
Error using parallel.internal.pool.InteractiveClient>iThrowWithCause (line 678)
Failed to start pool.
Error using parallel.Job/submit (line 351)
Job submission failed because the integration function 'communicatingSubmitFcn.m' errored.
Error using communicatingSubmitFcn (line 122)
Submit failed with the following message:
sbatch: error: CPU count per node can not be satisfied
sbatch: error: Batch job submission failed: Requested node configuration is not available
Raymond Norris
Raymond Norris on 17 Oct 2022
Slurm is telling you that your combonation of cores, threads, and nodes is not available. By the looks of it, I'd say someone on our team helped implement when you're doing (i.e., using configCluster). If you're interested, contact Technical Support (support@mathworks.com) with your contact info. They in turn can get a hold of me. We can work this out offline.

Sign in to comment.

Categories

Find more on Parallel Computing Fundamentals in Help Center and File Exchange

Products


Release

R2019a

Community Treasure Hunt

Find the treasures in MATLAB Central and discover how the community can help you!

Start Hunting!