Main Content

Nonlinear Modeling

Nonlinear elements, nonlinear behavior, intermodulation distortion, IP2/IP3, interference

Use these blocks to specify the nonlinear behavior of amplifiers and mixers. Such behavior includes IP2/IP3, intermodulation distortion and 1-dB compression. You can also simulate frequency-dependent mismatches between components.

Blocks

expand all

AmplifierModel amplifier in RF systems
MixerModel mixer in RF systems
IMT MixerModel mixer using intermodulation table (IMT)
Power AmplifierModel power amplifier with memory
VGAModel variable gain amplifier
OIP3 TestbenchMeasure output third intercept point of system
IIP3 TestbenchMeasure input third intercept point of system
OIP2 TestbenchMeasure output second intercept point of system
IIP2 TestbenchMeasure input second intercept point of system
IQ DemodulatorConvert RF signal to baseband signal
IQ ModulatorConvert baseband signal to RF signal
ModulatorModel RF to RF modulator
DemodulatorModel RF to RF demodulator

Topics

Featured Examples

Go to top of page