Assessment failure in Task 1 of Solar Energy module: P_AC signal shows incorrect at the end of simulation.
Show older comments

I am experiencing a persistent assessment failure in the "Solar Energy" section, Task 1, of the Power Systems Simulation Onramp course.
The Problem: I have connected the signal labeled P_AC to the Signal Assessment block as instructed. The connection in the model is a solid black line, yet the assessment returns "Incorrect" with a hint suggesting an unconnected signal.
Symptoms:
- The Assessment graph shows red dots (incorrect data) specifically at the end of the simulation period (approx. seconds 23-25).
- I have confirmed that the Enable MPPT block is set to 0.
Steps already taken:
- Deleted and re-connected the P_AC signal multiple times to ensure a solid connection.
- Ran the simulation until completion (100% ready).
- Used the "Reset" button for the task and re-attempted.
Could you please check if this is a known issue with the auto-grader for this specific task?
Accepted Answer
More Answers (0)
Categories
Find more on Choose and Parameterize Blocks in Help Center and File Exchange
Community Treasure Hunt
Find the treasures in MATLAB Central and discover how the community can help you!
Start Hunting!